Pearpoint’s new Cradle supports the P356 crawler, providing centering in 1.5m (60”) pipes. The Cradle has been designed to allow access via a 600x600mm (23x23”) manhole, while also enabling transit through debris-strewn pipes and silted storm drains. Ground-clearance and 330mm (13”) wheels allow the Cradle to climb over obstacles such as 100mm (4”) house bricks.
There is no requirement to update any existing control modules or P356 crawlers.
Mounting of the P356 is quick and easy, requiring no specialist tools. Once the P356’s wheels have been removed, the crawler is fixed in place with one simple hand-screw, making the addition of the P356 Cradle to your P350 flexitrax system very straightforward.
The new P356 Cradle will be available from mid-January 2018. A Compact Cradle, for deployment through 21” (530mm) man-holes will be available from March 2018.